Sunday 10 November 2013

Dungeon Architecture.

Spent some time earlier today prepping these ready for moulding:






There are also a set of conventional steps in the pipeline along with two more doorways, these are a little more elaborate than the basic models shown above.
Once the moulds for these are done I will be able to start assembling the boxed sets ready for sale, then its a case of setting up the retail end of the operation which I suspect might be the biggest challenge yet.

1 comment:

  1. Nice terrain, HGA. I love the spiral stairs. Best, Dean

    ReplyDelete